One turnkey process in six stages. Every stage has a clear result for you and one person responsible for it.

Play video

“Placeholder for the founder’s personal promise: why he stands behind every stage of the process, and how to reach him directly.”

Victor KuznetsovFounder, Metropolitan Living Design

Engineering perfectionism

What you don’t see in the renders decides how long the interior will last.

  • MEP

    HVAC, plumbing, electrical, acoustics and smart home are designed together, so nothing gets cut into finished walls.

  • Structure

    Every layout change is checked against the building structure and approved with the developer and authorities.

  • Details

    Joinery, stone and lighting junctions are drawn to the millimetre — that is what makes an interior age well.

Our guarantees

Four commitments you get from day one, not after the first problem.

  • Fixed

    Deadline commitment

    The timeline is part of the contract.

  • 1 year

    1-year warranty

    On all works after handover.

  • 1 PM

    Dedicated project manager

    One person accountable from day one.

  • 24/7

    24/7 support

    Reachable whenever something needs attention.

Turnkey roadmap

Six stages, each with a clear result for you and one person responsible for it. Procurement runs in parallel with site works.

Contract signed

  • Concept

    Lead designer

    Brief, site survey, budget frame

  • Design

    Design team and engineers

    Layouts, engineering, 3D visuals

  • Procurement

    In parallel
    Procurement manager

    Specification, orders, factory production

  • Construction

    In parallel
    Project manager

    Base works, MEP, stone, joinery

  • FF&E

    FF&E team

    Delivery, installation, styling

  • Handover

    Project manager

    Snagging, final check, documents

  • Keys handed over

Full transparency

Everything we know aboutyour project, you know too — the same day.

Private Residence, Palm JumeirahReport №5 — 26 Jun 2026
67%Overall completion
Stone & joineryCurrent stage — 3 of 6
On trackHandover Aug 2026
3Decisions waiting for you
Activity
Mar
Apr
May
Jun
Jul
Aug
Electrical works — cable pulling
In progress
Ceiling works (framing)
Completed
Ceilings soundproofing
Completed
Wet areas waterproofing
In progress
Floors preparation and levelling
Completed
Marble works — bathrooms
In progress
Outdoor tiles fixing
Scheduled
Planned
Completed
In progress

Needs your decision

Logistics strategy approvalVariation No. 2 approvalOutdoor furniture upgrade

* Sample report. Every client receives this reporting on their own project.

Monthly reports

Every month you get the full progress report: schedule, procurement, site photos and what we need from you.

Inside every report

  • Executive summary and overall completion
  • Site timeline, planned vs actual
  • Procurement and deliveries with ETAs
  • Progress photos from site
  • Decisions needed from you

* Sample report. Every client receives this reporting on their own project.

Your site, around the clock

Every client gets access to site cameras in a mobile app — see progress in real time from anywhere.

4 camerasOn site, 24/7
30-day archiveRewind any day
Mobile appPersonal access for you
REC
14:32:08 GST
CAM 01 — Master bedroom
REC
14:32:08 GST
CAM 02 — Bath
REC
14:32:08 GST
CAM 03 — Kitchen
REC
14:32:08 GST
CAM 04 — Library

* Sample report. Every client receives this reporting on their own project.

Deliveries Europe → Dubai

Furniture, joinery and lighting are made to order in Europe and shipped by sea. You see every container, what is inside and when it arrives.

3 CONTAINERS — 1 DELIVERED, 1 AT SEA, 1 IN PRODUCTIONSEA FREIGHT, DOOR TO DOOR
Delivered
40 ft

Container 1

Parquet, technical lighting, sanitaryware, wall panels, decorative lighting

ProductionDone
At seaDeparted 9 Jul
Delivered23 Aug
At sea
40 ft

Container 2

Doors and partitions, kitchen, wardrobes, entrance cabinets, bedroom carpets

ProductionDone
At seaDeparted 29 Jul
DeliveredETA 12 Sep
In production
40 ft

Container 3

Freestanding furniture, office carpet, decorative lighting

ProductionIn progress
At seaDeparts 15 Sep
DeliveredETA 30 Oct
Suppliers on this project
RimadesioLemaiGuzziniCasa NobiliAsterFoglio DoroFerreira de Sá

* Sample report. Every client receives this reporting on their own project.

No signature, no change

Budget and schedule move only after you sign the variation. Every change is justified in writing.

Request

You or the team propose a change.

→

Estimate

We calculate the impact on budget and timeline.

→

Approval

Nothing changes until you sign the variation.

→

Update

Budget and roadmap are updated in the next report.

* Sample report. Every client receives this reporting on their own project.

How we stay in touch

A typical month on your project — one project manager
is your single point of contact.

Any timeSite cameras in the mobile app
Every weekSite update from your project manager
Every monthFull progress report
At every stageSign-off meeting before the next stage

June 2026

Cameras live every day
MonTueWedThuFriSatSun1234Weekly update567891011Weekly update12131415161718Weekly update19202122232425Weekly update26Monthly report27282930
Weekly updateMonthly report

* Sample report. Every client receives this reporting on their own project.

Questions and answers

See how this would work for your property

Tell us about your property and what you want to achieve.
We’ll get back to you to arrange a first meeting.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Close